North Summertown project ground floor extension on a 4 bed property.

Brief - To relocate new kitchen, design and install new bathrooms with top to bottom interior design advice throughout the project.

This was a large project that involved working with a sub contractor.on the build and finish. The turnaround time was tight working within a limited budget which we kept to on the interior design side. As this project ran four weeks over on the construction side ByEmmaJaneInteriors arranged all serviced accommodation with no additional fee.

Before images

After images

Scroll to top